Skip to content
Mist cooling · Dust suppression · Fogging · Humidification — Qatar & GCC

Misting System Maintenance in Hard-Water Areas: A Pre-Summer Checklist

November 15, 2026TrueMIST engineering team

Many Gulf water supplies are hard or carry sediment from storage tanks. Over a season, minerals and dirt block fine nozzles, reduce pressure and wear pump seals. A short service before summer prevents most problems.

Pre-summer checklist

  1. Filters: replace sediment and scale-inhibitor cartridges; check the high-pressure inline filter.
  2. Nozzles: run each zone and look for weak or uneven spray; soak blocked nozzles in cleaner and refit.
  3. Pump: check oil level and colour, look for leaks, confirm operating pressure on the gauge.
  4. Lines: flush lines through the end drain; check fittings for leaks and UV damage.
  5. Controls: test timers, sensors and remotes; check humidity and temperature set points.
  6. Hygiene: for hospitality sites, flush lines after long idle periods.

When to call for service

  • Pressure lower than normal or fluctuating.
  • Dripping nozzles or wet floors.
  • Pump noisy, hot or leaking oil.

Our annual maintenance contracts include pre-summer service, periodic visits and spares.

Next step

Tell us about your site — we will recommend the right system

Share the area, the problem and a few photos — our engineers reply with a recommended approach and budget estimate.