Industry
Pre-cooling and mist systems for power plants
Help air-cooled plant equipment cope with peak summer temperatures, and control dust from fuel and ash handling.
- Site survey & system design
- Supply, installation & AMC
- Qatar & GCC coverage

Site challenges
Problems we solve on these sites
Hot intake air
Air-cooled condensers, chillers and auxiliary coolers.
Fuel and ash dust
Coal, biomass and ash handling systems.
Outdoor maintenance heat
Outage and switchyard work.
Typical application points
- Air-cooled chillers serving buildings and control rooms
- Auxiliary air-cooled heat exchangers
- Coal/biomass conveyors and transfer towers
- Ash silos and loading
- Workshops and outage laydown areas
- Solar O&M rest areas
Recommended systems
Solutions that fit
Adiabatic pre-cooling
Chillers, condensers and air-cooled exchangers.
ExploreDust suppression misting
Fixed high-pressure nozzle rings at dust sources.
ExploreDry fog
Respirable dust control with minimal moisture.
ExploreWorker heat-stress cooling
Cooling stations, rest areas and gates.
ExploreIndustrial mist cooling
Cooler workshops, halls and work zones.
ExploreFog cannons
Long-throw coverage for stockpiles and yards.
ExploreHow we work
From site survey to after-sales support
Survey & brief
We review the area, climate, water, power and the problem you need to solve — on site or from photos and drawings.
Engineering design
Pump size, pressure, nozzle type and spacing, line routing, filtration and controls are selected for your site.
Supply & installation
Our team installs and commissions the system, tests every zone and trains your operators.
Maintenance & spares
Scheduled AMC visits, filters, nozzles and pump spares keep the system performing season after season.
Related solutions
FAQ
Frequently asked questions
Can pre-cooling be applied to large air-cooled condensers?
Yes, as a zoned system with treated (usually RO) water and controls tied to ambient temperature. The design must be agreed with the plant’s engineering team.
Can you work under our permit-to-work and HSE procedures?
Yes. We prepare method statements and risk assessments, follow site induction and permit-to-work rules, and coordinate shutdown windows with your operations team.
What water quality does a misting system need?
Fine nozzles need clean, filtered water. In most GCC sites we fit sediment and inline filters and, where water is hard, a scale-inhibiting filter or an RO supply. Treated water protects nozzles and pumps and keeps maintenance predictable.
Do you supply and install outside Qatar?
Yes. S Flo Trading and Contracting WLL is based in Doha and delivers TrueMIST projects across the GCC, working with associates in Bahrain, the UAE and Saudi Arabia and supporting projects in Oman and Kuwait. Share your location and we will confirm the delivery and installation route.
Next step
Tell us about your site — we will recommend the right system
Share the area, the problem (heat, dust, odour or humidity) and a few photos. Our engineers reply with a recommended approach, layout and budget estimate — usually within one working day.